RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Read about product updates and completed work. The Launch board tracks milestones, including the original mapping-service target of Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

Showing 4 of 467

Clear filters

Monday, October 5, 2026

  1. this ship

    UPS LAN agent for MSPs + /report fix

    Company admins on MSP / IT seats download a UPS agent from /ups. It SNMP-reads the rack UPS on the shop LAN and HTTPS-outs charge, load, and battery minutes. /report no longer crashes when you filter. Leftover RackLume product sentences on Floors and Account now say RackLume.

    • ●Download UPS agent at the top of /ups. Harborline and Free stay off. Email fires when a UPS goes on battery.
    • ●/report tables render their own rows — no more The tool hiccuped from passing functions into the client table.
    • ●Floors clip copy and vendor/RMM Account lines say RackLume. Frozen cameras list and OG card were not touched.

Friday, October 2, 2026

  1. this ship

    Click an AP — UniFi pull opens the AP page

    Air list and floor pins open /wireless/[id] after a UniFi pull. The existing shop key is enough — no new key. Clients, radios, and usage stay from the last pull.

    • ●Plant ids and controller MACs both resolve. Walk-by-AP names link to the same page.
    • ●Report pages filter by search, kind, floor, and status.

Thursday, October 1, 2026

  1. this ship

    Report opens Plant, Clients, Billing, Tickets

    The shop Report rail now opens four reports. Plant stays the network checklist. Clients, billing, and tickets are printable lists. This is not the Enlighten error log.

    • ●Rail children are Plant, Clients, Billing, and Tickets — icon plus one word.
    • ●Plant stays /report. New pages: /report/clients, /report/billing, /report/tickets.

Tuesday, September 29, 2026

  1. this ship

    Network report is on the shop rail

    Signed-in shops open Report for this building’s devices, the 2D floor plates, and a checklist they can tick. It is not the Enlighten error log.

    • ●Rail word is Report. Print keeps the RackLume lockup and Powered by Enlighten.
    • ●Harborline stays the demo plant. A real company only sees its own gear.

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.