
Waukesha, Wisconsin · what’s new
Read about product updates and completed work. The Launch board tracks milestones, including the original mapping-service target of Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.
75 updates · latest Delete and rename floors on Floors
24 updates · latest Air and Switches update from connected systems
28 updates · latest Clearer instructions and private customer support
142 updates · latest Document and trace closet connections
20 updates · latest Keep Outfit fonts available for PDF downloads
4 updates · latest Panel-walk CSV loads a live building electrical plant
128 updates · latest RackLume branding completed
10 updates · latest Sign in with fingerprint / Face
Wednesday, October 7, 2026
this ship
Turn on fingerprint or Face unlock under Account, then use it on Sign in and in the RackLume app. Same secure session as password — no second password store on the phone.
Thursday, October 1, 2026
this ship
Sign in can keep this device for 30 days. Sign up can skip or apply an authenticator. If you skip, Account turns it on later.
Thursday, September 24, 2026
this ship
The public log and the operator log start as area cards (Floors, Air, Free edition, Plant, Jobs, Electric, Site, Ops). Open a card for every ship in that area, or Full log for the whole diary. Nothing was deleted. Field pages do not load this log.
this ship
After two days of new features, every signed-in click was re-running launch-board stamps and re-parsing lantern.json. That work now happens once when Node starts. Free testers with leftover shop flags see Ask to upgrade on Jobs/Billing, not a contractor ledger.
Tuesday, September 22, 2026
this ship
Postgres now maps the Work book, encrypted vault rows, ISP gateways, and shop username / first / last. JSON stays live Sign in. Ciphertext only — vault.key stays on the data dir. No ISP partner API.
Sunday, September 20, 2026
this ship
Public /signup creates a real Free package seat: Find, Floors, Air, Switches, Computers, and Lens on one building. Jobs, Billing, Team, SOP, Fluke, and Electric Pro stay paid. Cable Pro remains the shop cash path.
Wednesday, September 16, 2026
this deploy
Enlighten and company admins can see who is signed in, a login audit, and revoke a seat. Quiet seats time out after 12 hours. Sign in still works. No passwords or hashes in the log.
this deploy
Michael confirmed the inventory lists are correct. Deploy refuses a SUPERSET from a behind branch that would drop Plant → Computers / Phones / Cameras or revert DeviceInventory to cards. Operator → Note stays with the same restore set.
this deploy
Michael was not crazy. Concurrent SUPERSET thrash wiped Plant → Computers, the DeviceInventory Phones/Cameras/Air lists, and Operator → Note from product source while another build was still live. Restored from the known-good tip. OG card freeze untouched.
this deploy
Merging a Cloud Agent draft on Origin does not rsync the Plesk VM. Publish deadline is 10px again after a later remainder rsync had put the pill back. Computers, six-port chassis, and Need-to-do cards stay. plant-data-source stays Doing.
36 updates · latest Restore Outfit typography across the portal
Updates are grouped by area. Open the full log to see every entry.
Full logWaukesha
Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.