
Waukesha, Wisconsin · what’s new
Read about product updates and completed work. The Launch board tracks milestones, including the original mapping-service target of Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.
Monday, October 5, 2026
this ship
Company admins on MSP / IT seats download a UPS agent from /ups. It SNMP-reads the rack UPS on the shop LAN and HTTPS-outs charge, load, and battery minutes. /report no longer crashes when you filter. Leftover RackLume product sentences on Floors and Account now say RackLume.
Friday, October 2, 2026
this ship
Air list and floor pins open /wireless/[id] after a UniFi pull. The existing shop key is enough — no new key. Clients, radios, and usage stay from the last pull.
Thursday, October 1, 2026
this ship
The shop Report rail now opens four reports. Plant stays the network checklist. Clients, billing, and tickets are printable lists. This is not the Enlighten error log.
Tuesday, September 29, 2026
this ship
Signed-in shops open Report for this building’s devices, the 2D floor plates, and a checklist they can tick. It is not the Enlighten error log.
Waukesha
Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.